At Golden Valley Construction, environmental performance is built into how we plan, procure and deliver every project. We operate a tailored Environmental Management System with daily on-site monitoring of noise, dust and vibration; robust controls to prevent water pollution (including spill-response plans, mats at refuelling points and wheel washes where required); and proactive waste minimisation and segregation from site to office.
We reduce greenhouse gas emissions by upgrading plant on a three-year cycle, maintaining our fleet to high standards, planning work and deliveries efficiently, and encouraging green travel and vehicle sharing.
All suppliers and subcontractors are briefed on our expectations, and we prioritise responsibly sourced materials—such as BES 6001 concrete, CARES/eco-reinforcement steel and FSC timber—while supporting local suppliers and using EPDs where available.
A whole-business Resource Management Plan guides each scheme from pre-start through delivery, tracking materials, labour and costs to cut waste and keep projects efficient. Guided by DEFRA’s waste hierarchy, we also champion practical reuse solutions on site and early client collaboration to avoid over-design and reduce resource use.
As a small business we do have our own EMS policy.
We have environment risk assessments in relation to Noise, Dust and Vibration. (These activities are also monitored on site daily by management).
We are committed to preventing water pollution when working near water courses and have thorough spillage event plans in place. We have mats also near refuelling areas. We look to obtain details of companies we can contact in the event of a major incident out of our control that would be within 10 minutes of any particular site we are working on.
Our aim is to minimise waste, segregate waste for example, timber, metal and even in our offices, waste such as paper, card and tins are separated.
If our site is large, we discuss green travel plans to reduce excessive fuel consumption on a daily basis.
Staff are encouraged to share travel to and from work and works vehicles are also shared to site.
Wheel washes have been used on certain sites where entering the highway from site is required.
Ground and surface water is also considered on sites we work at.
All suppliers and subcontractors are notified of our expectations prior to entering our sites.
Responsible sourcing of materials to be requested from our suppliers and subcontractor.
We look at concrete supplies to be BES 6001, steel eco-reinforcement or CARES SCS and FSC for timber supplies for example.
Targets
Achievements
As a small business, we aim to use and support as many local suppliers as possible. This has been our focus.
To ensure resources are managed correctly, GVC will take a whole business approach from office to site workers. A clear plan prior to works starting will enable efficiency across the project. These will include, raw materials used, equipment, labour, facilities/ welfare & financial resources.
A list of materials and quantities are compiled for the project. Scope of works and estimates of costs of labour, materials and equipment are taken into consideration. A budget of the project is now possible to produce. Resources are then acquired and project can commence. Allocation of resources and tracking of utilisation is monitored along the project to ensure project is kept at or under budget.
We have used this system to manage our resources and schemes at a successful delivery rate to date.
We follow DEFRA’s waste hierarchy as a guide in our everyday activities on and off site – please see graphic below: