Home » Case Studies » Hampton Court Bridge
case studies
Project Brief: To Replace the parapet on the downstream side of the bridge. The parapet had become unserviceable due to erosion. These works were essential, in order to maintain the road edge protection to the required standards. Repointing other sections of the bridge were required where mortar loss was present.
GET A QUOTE
Like what we delivered here? We can scope, price and programme a similar scheme for your site—complete with drawings, RAMS and clear timelines.
We aim to get back to you with 24 working hours…
Please give us some more details and we’ll get in touch to arrange a date.